An aerated wastewater treatment system (AWTS) is a small on-site treatment plant: it settles household wastewater, bubbles air through it so aerobic bacteria can break the waste down, then disinfects the effluent and pumps it to an irrigation area. It produces a cleaner effluent than a conventional septic tank, but it needs power all the time, a service agent on contract and regular desludging. In NSW every domestic AWTS must hold a NSW Health accreditation, and the conditions of that accreditation, including how often it is serviced, become part of the owner’s approval to operate.
What does AWTS stand for?
AWTS stands for aerated wastewater treatment system. NSW guidance classes it as a secondary treatment system: all domestic AWTS must hold NSW Health accreditation under the Secondary Treatment System Accreditation Guideline 2018, and the certificate sets each system’s capacity in equivalent persons (NSW Office of Local Government, Onsite Wastewater Management Guidelines, April 2025, p.106). NSW Health keeps a register of accredited AWTS.
How an AWTS works
The OLG guidelines say an AWTS typically includes a primary chamber, an aeration chamber, a clarification chamber, a disinfection unit and a pump chamber (p.106). In order:
- Primary chamber. Solids settle and anaerobic digestion starts, as in a septic tank (NSW Department of Local Government, The Easy Septic Guide, 2000, p.33).
- Aeration chamber. Air is bubbled through the effluent so aerobic bacteria digest the waste. This needs “a constant and reliable power-supply” (OLG, p.106).
- Clarification chamber. Remaining solids settle out; where a system has a sludge return, NSW Health lists it among the parts checked at every service (STSA guideline, A3.4.4).
- Disinfection. Chlorine or ultraviolet light treats the effluent before it is pumped to the irrigation area (Easy Septic Guide, p.33).
NSW Health’s accreditation conditions set the standard the final effluent must meet in any grab sample: BOD5 under 30 mg/L, suspended solids under 45 mg/L, E. coli under 100 cfu/100 mL, and free residual chlorine between 0.2 and 2.0 mg/L (NSW Health, Secondary Treatment System Accreditation Guideline 2018, A3.5.1). The 2025 OLG guidelines set stricter objectives for chlorination itself; the chlorination guide compares the two.
Why council requires an AWTS on some sites
No council in this area publishes a list of sites where an AWTS is mandatory. The system is chosen from the site and soil assessment: the OLG guidelines say to start from the site and soil constraints and work backwards through the treatment train (p.162). Port Macquarie-Hastings Council asks for a geotechnical wastewater report by a suitably qualified person with every section 68 application (PMHC, On-site sewage approvals).
The OLG guidelines list improving effluent quality as one way to deal with a small lot (Table 7-1, p.163), and say AWTS allow “greater EAA options” and “reduced buffers” for the effluent application area (Table 7-2, p.170). The same table lists the trade-offs: servicing costs, high sensitivity to poor maintenance and a continuous energy need.
NSW quarterly servicing requirement
NSW Health’s guideline requires the owner to keep a contract or agreement of at least 12 months with a service agent who is employed or authorised by the manufacturer, and to have the system serviced at the monthly interval set in its accreditation (A3.4.1, A3.4.3). MidCoast Council says AWTS “must be serviced every 3 months (or otherwise approved) by an accredited service agent”, and Kempsey Shire Council’s AWTS checklist asks for a service every three months with the report sent to council within seven days. Port Macquarie-Hastings Council’s on-site sewage page does not set out its own servicing wording, so check the approval to operate for the property.
The OLG guidelines say it is the owner’s responsibility to make sure council receives the service report (p.41). The aerated system servicing page and the AWTS service contracts guide cover what to expect from a service and a contract.
AWTS pump-out requirements
An AWTS still collects sludge. Kempsey’s AWTS checklist says the primary chamber should be desludged by an authorised pump-out contractor every 3 to 5 years. The OLG guidelines recommend measuring sludge every year and desludging no later than when sludge and scum fill one third of the tank depth, or come within 150 mm of the inlet or outlet (pp.225-226). Desludging is a septic pump-out, usually priced separately from servicing.
AWTS alarm systems
The owner’s manual for an accredited system must explain what to do if the system fails or the alarm goes off (STSA guideline, A3.2.2). A persistent alarm usually means a pump, blower or float needs attention; the AWTS alarm troubleshooting guide covers the common causes. An OLG case study describes an unserviced AWTS whose failed pump let it flood, damaging the aerator and alarm without the owner knowing (p.252). If wastewater is surfacing or backing up, see emergency septic pump-outs.
AWTS running costs: what to budget for
No publisher gives a Port Macquarie or NSW price for AWTS servicing. The ongoing costs come from:
- the service contract, at the interval in the system’s accreditation
- desludging the primary chamber
- replacement parts: NSW Health’s guideline gives mechanical and electrical components an expected service life of 5 years and other components 15 years (A3.1.2)
- electricity, since the aerator runs continuously
- the council’s annual charge: in 2026-27 Port Macquarie-Hastings Council charges a residential system $50.00 a year in the low risk band, $100.00 in the medium band and $140.00 in the high band (PMHC Fees and Charges 2026-27, p.20)
The septic vs AWTS lifetime cost guide compares the two over time, and the septic pump-out cost guide lists the council fees for all three councils.
Common AWTS problems and solutions
The usual problems are power loss, since the aerator and pumps need constant power (OLG, p.106; see the AWTS power outage guide), and blocked irrigation lines: the Easy Septic Guide says effluent irrigation systems are “susceptible to blockage and require regular maintenance service” (p.19). Disinfection faults are picked up at the scheduled service, which is one more reason not to let servicing lapse.
AWTS vs biofilter system
Aerobic sand and media filters are another secondary treatment option, with a low energy requirement, but the OLG guidelines note their maintenance is often left to the owner, with variable results (Table 7-2, p.170). The biofilter treatment guide compares them in more detail.
Buying a property with an AWTS
Ask the seller for the approval to operate, recent service reports and the date of the last desludge. A new owner in Port Macquarie-Hastings must apply for an approval to operate within 3 months of the property transfer, and the council recommends a pre-purchase inspection (PMHC, On-site sewage approvals); its 2026-27 fee for a standard domestic pre-purchase inspection is $340.00, which includes approval to operate if the sale proceeds (PMHC Fees and Charges 2026-27, p.20). A septic inspection by a contractor is another option.
FAQ
How much does a new AWTS cost to install in Port Macquarie?
No publisher gives a Port Macquarie figure. Airtasker’s national page puts a wastewater treatment system, supplied and installed, at $15,000-$20,000, last updated 17 January 2023 (Airtasker, Septic tank installation cost), and Port Macquarie-Hastings Council’s 2026-27 fee to install, construct and operate a new domestic facility is $645.00 (PMHC fees, p.19). The new septic install cost guide has more detail.
How often does an AWTS need to be pumped out?
Kempsey Shire Council’s AWTS checklist says the primary chamber should be desludged every 3 to 5 years; the OLG guidelines say to measure sludge yearly.
Can I do the quarterly service myself?
No, unless the manufacturer authorises it. NSW Health’s guideline says the owner “shall not service” the system unless “authorised by the manufacturer” (A3.4.2).
What should I do if my AWTS alarm goes off at night?
Follow the owner’s manual, cut water use and keep people off the irrigation area, then contact the service agent. If wastewater is surfacing or backing up into the house, treat it as an emergency.
Can an AWTS handle the load from a holiday rental with a full house?
It depends on the design. The OLG guidelines list “limited ability to handle shock or intermittent flows” as an AWTS limitation unless the system is designed for it, and note that NSW Health accredited systems are now tested for shock and intermittent flow (p.170). The holiday rental septic guide covers peak loads.
Request a quote with the suburb, the system brand (usually on the control box) and whether anything is alarming now.
Sources
- NSW Office of Local Government, Onsite Wastewater Management Guidelines (April 2025): AWTS description and accreditation (p.106), service reports (p.41), system selection (pp.162-163, 169-170), desludging (pp.225-226), case study (p.252). Checked 16/11/2026.
- NSW Health, Secondary Treatment System Accreditation Guideline 2018: service life (A3.1.2), owner’s manual (A3.2.2), maintenance (A3.4), effluent quality (A3.5.1). Checked 16/11/2026.
- NSW Health, Register of accredited AWTS. Checked 16/11/2026.
- NSW Department of Local Government, The Easy Septic Guide (2000, PDF hosted by MidCoast Council): how an AWTS works, irrigation maintenance. Checked 16/11/2026.
- MidCoast Council, On-site wastewater management: servicing every 3 months. Checked 16/11/2026.
- Kempsey Shire Council, AWTS checklist: three-monthly service, report within seven days, desludging every 3 to 5 years. Checked 16/11/2026.
- Port Macquarie-Hastings Council, On-site sewage approvals: geotechnical report, new owners, pre-purchase inspection. Checked 16/11/2026.
- Port Macquarie-Hastings Council, Fees and Charges 2026-27: annual charges, pre-purchase inspection and new facility fees (pp.19-20). Checked 16/11/2026.
- Airtasker, Septic tank installation cost: national installation figure, last updated 17 January 2023. Checked 16/11/2026.