To install, construct or alter a septic tank, aerated system or other on-site sewage system in the Port Macquarie-Hastings area you need a section 68 approval from Port Macquarie-Hastings Council (PMHC) before work starts, lodged through the NSW Planning Portal. Once the system is in, it also needs an approval to operate, and each new owner applies for their own. The council’s 2026-27 fee for a new domestic system is $645.00, which covers assessment, three inspections and the first approval to operate (PMHC Fees & Charges 2026-27, p.19).
Who needs approval?
PMHC says on-site systems are required “in all areas where connection to a sewer service is not available”, and that a section 68 approval is needed to install, construct or alter a waste treatment device, a human waste storage facility such as a septic tank, or a drain connected to one (PMHC, On-site sewage approvals). Section 68 is in the Local Government Act 1993. PMHC lists greywater irrigation systems among the types of on-site system.
The page lists installing, constructing and altering; it does not list pump-outs or routine servicing. Whether a particular job, such as a replacement tank, a conversion from a conventional septic to an aerated wastewater treatment system (AWTS) or a change to the land application area, counts as installing or altering is a question to put to the council before work starts. Properties in MidCoast or Kempsey Shire apply to those councils instead.
Step 1: site and soil assessment
The application needs a geotechnical wastewater report prepared by a suitably qualified person, so the system is designed to suit the site (PMHC). The assessor looks at soil, slope, drainage and the distances to water and boundaries, and recommends a system type and land application area. The site assessment and percolation test guide explains what is tested, and the setback distances guide covers buffers.
The system itself must be an accredited model where accreditation applies: NSW Health says a council must not approve certain sewage management facilities, including septic tanks, AWTS and greywater treatment systems, unless they are accredited by the NSW Ministry of Health (NSW Health).
Step 2: lodge the section 68 application
PMHC applications are lodged through the NSW Planning Portal and need:
- the geotechnical wastewater report
- a site plan showing boundaries, neighbouring land uses, all existing and proposed buildings, and nearby waterways, dams or sensitive areas
- system details: type, make and model, and any surface irrigation or raised garden beds
After lodgement the applicant receives an acknowledgement and a fee quote; council assesses the application once the fee is paid, may ask for more information, and then issues a determination (PMHC). PMHC does not publish a target processing time on that page, so ask when lodging. Where the septic is part of a new house, the house itself may need its own development consent; the council or a certifier can confirm the pathway.
Step 3: installation and inspections
Drainage work connected to an on-site system is licensed work. NSW requires a licence or certificate for any plumbing or draining work “regardless of the cost of the work”, and draining includes work on a house drain connected to an on-site wastewater management system (NSW Government, Plumbing, draining and gasfitting). PMHC’s fee for a new domestic system includes three inspections; book them as the approval directs and do not backfill until the relevant inspection is done.
Step 4: approval to operate
The new-system fee includes the first approval to operate. After that:
- New owners must apply for an approval to operate “within 3 months of property transfer” (PMHC); the 2026-27 fee is $195.00 including one inspection (PMHC fees, p.19).
- Annual charges appear on the rates notice: $50.00 (low risk), $100.00 (medium) or $140.00 (high) a year for a residential system in 2026-27 (PMHC fees, p.20). No PMHC page found explains how a system is classed.
- AWTS owners keep a service contract of at least 12 months with a manufacturer-authorised agent, who sends a service report to council after every service (NSW Health Secondary Treatment System Accreditation Guideline 2018).
The approval to operate guide covers renewals and transfers in more detail.
PMHC septic approval fees, 2026-27
| Fee (council’s label) | Amount | Source |
|---|---|---|
| Install, construct and operate a new sewage management facility, domestic (incl. assessment, 3 inspections, first approval to operate) | $645.00 | PMHC Fees & Charges 2026-27 p.19 |
| Alter an existing facility, domestic (incl. reassessment and 1 extra inspection) | $315.00 | PMHC Fees & Charges 2026-27 p.19 |
| Re-inspection, domestic | $190.00 | PMHC Fees & Charges 2026-27 p.20 |
| Pre-purchase inspection, domestic, standard (under 21 business days) | $340.00 | PMHC Fees & Charges 2026-27 p.20 |
The schedule shows no GST on these fees. The consultant’s report, the system and the installation are separate costs; the new septic install cost guide covers those.
Common hold-ups
- an incomplete Planning Portal application (missing report, site plan or system details)
- a site plan that leaves out dams, waterways or neighbouring buildings
- a system or land application area that does not suit the soil or the space available
- starting work, or backfilling, before approval or inspection
Request a quote for a septic inspection of an existing system, or for the installation once the design is approved. The enquiry may be passed to an independent licensed contractor who quotes and contracts in their own name.
Frequently asked questions
Does a septic system need a development application in Port Macquarie?
The septic system itself needs a section 68 approval, lodged through the NSW Planning Portal (PMHC). A new house or other building work may need its own consent, so confirm the pathway with council.
How much is PMHC’s septic approval fee?
For 2026-27, $645.00 to install, construct and operate a new domestic system, and $315.00 to alter an existing one (PMHC Fees & Charges 2026-27, p.19).
Do I need approval to repair a septic tank?
PMHC requires section 68 approval to install, construct or alter a system (PMHC). For a repair such as relaying pipes or replacing the tank, ask the council whether it counts as an alteration before starting.
What happens when I buy a property with a septic system?
Apply for an approval to operate within 3 months of transfer. PMHC also recommends a pre-purchase inspection, noting these systems “are not covered in building inspections” (PMHC).
Sources
- Port Macquarie-Hastings Council: On-site sewage approvals: section 68, Planning Portal, documents, approval to operate, checked 15/11/2026
- Port Macquarie-Hastings Council: Fees and Charges 2026-27, pp.19-20, checked 15/11/2026
- NSW Health: Single domestic wastewater management: accreditation under the Local Government (General) Regulation 2021, checked 15/11/2026
- NSW Health: Secondary Treatment System Accreditation Guideline 2018 (PDF): AWTS service contracts and reports, checked 15/11/2026
- NSW Government: Plumbing, draining and gasfitting, checked 15/11/2026