Before a new septic system can be approved in NSW, a qualified assessor carries out a site and soil evaluation: test pits and boreholes in the proposed effluent area, a description of each soil layer, and an estimate of how fast the soil can take water, which sets the size of the trenches or irrigation area. The traditional “perc test” is no longer the way to measure that. The NSW Office of Local Government’s Onsite Wastewater Management Guidelines (April 2025), which replace the 1998 guidelines, say “a falling head percolation test should not be used to determine soil permeability” (section 4.3.4). Permeability is assessed from soil texture and structure, or measured with a constant-head permeameter.
What a site assessment covers
The OLG guidelines say site and soil evaluation is “required as part of all OWMS designs” and “for all unsewered developments where effluent is to be wholly or partially managed onsite” (sections 4.1 and 4.1.1). Its depth varies with the system and the risk, and some councils have “deemed to comply” provisions that allow a reduced assessment. It typically covers:
- A desktop study of the lot: restrictions on the title, existing approved systems, and a constraints map with test pit locations marked in advance (section 4.2.3).
- The site: landform, slope, drainage, waterways, bores and buffers to boundaries and buildings.
- Soil test pits and boreholes in the proposed effluent area: at least one test pit and two confirmatory boreholes, one near the centre and one at each end, dug to at least 1.0 m or 0.6 m below the point of application, whichever is deeper (section 4.3.3). More are needed if the soil varies.
- Soil description and samples from each layer: depths, texture, structure, colour and mottling, hard pans, bedrock and water tables, with photos of each pit and samples bagged for testing (section 4.3.4).
- A design report recommending the treatment system and the size of the effluent application area.
In Port Macquarie-Hastings this report is the “geotechnical waste water report” that a section 68 application must include, “conducted by a suitable qualified person” (PMHC, On-site sewage approvals). The council approval guide covers the application itself.
The percolation test: what actually happens
A falling-head percolation test fills a hole with water and times how fast the level drops. The OLG guidelines rule it out for working out soil permeability. Instead, the soil’s saturated hydraulic conductivity (Ksat) is estimated by field or laboratory assessment of texture and structure, or measured “by use of a constant head permeameter such as the Talsma-Hallam, Guelph or disk permeameter or double ring infiltrometer” (section 4.3.4). The guidelines add:
- the test liquid should be similar to effluent (SAR 5), and the results of a clean-water test “do not translate directly” to a loading rate for effluent
- soil structure must be seen in a test pit wall or a dug-out block, because it “cannot be adequately assessed from soils extracted by auger”
- without a proper structure assessment, designers and regulators should assume the lowest loading rate for that soil texture
- measurements should be made by “appropriately experienced and qualified persons”.
If a report for a property you are buying or building on relies only on a falling-head perc test, ask the assessor how it meets the current guidelines.
What the results mean for system type
The OLG guidelines group soils into categories by texture and structure, each with an indicative permeability (Table 4-7; Table 6-4 repeats the same bands in metres a day). A selection:
| Soil category | Structure and texture | Indicative Ksat (m/day) |
|---|---|---|
| 1 | Structureless gravels and sands | over 3.0 |
| 2a / 2b | Weakly structured / massive sandy loams | over 3.0 / 1.4 to 3.0 |
| 3a / 3b | Structured / weakly structured or massive loams | 1.5 to 3.0 / 0.5 to 1.5 |
| 4a to 4c | Clay loams, structured to massive | 0.5 to 1.5 down to 0.06 to 0.12 |
| 5a to 5c | Light clays, highly structured to massive | 0.12 to 0.5 down to under 0.06 |
| 6a to 6c | Medium to heavy clays | 0.06 to 0.5 down to under 0.06 |
The design loading rate for trenches, beds, irrigation and mounds is then taken from the least permeable layer within 0.6 m below the point of application, and it is “substantially lower than the indicative permeability” because it reflects years of effluent, not clean water (section 6.3.1, adapting AS/NZS 1547:2012). Very sandy soils move effluent quickly but give pathogens and nutrients a faster path to groundwater; heavy clays take effluent slowly and can waterlog (section 4.3.4). The leach drain sizing guide shows how the rate turns into a trench length.
Mottled soil and seasonal waterlogging
Mottles are spots or streaks of a different colour from the surrounding soil. The OLG guidelines say “dull, grey or mottled soils indicate continuous or seasonal saturation”, and nodules of iron or manganese point to periodic waterlogging (section 4.3.4). The seasonal high water table counts as a limiting layer, and there must be at least 0.6 m of free-draining soil beneath the point of application (section 4.3.3). If the water table comes within 0.6 m, the guidelines say to import soil to increase the separation or build a raised bed or mound. The trench vs mound guide explains that choice.
Who conducts the site assessment?
The OLG guidelines put the responsibility for engaging the assessor on “the landowner or developer” (section 4.1). The assessor should generally have a tertiary qualification in a field such as soil science, geoscience, agricultural or environmental science or environmental engineering, practical experience in onsite wastewater design, and current professional indemnity insurance, which the guidelines say should be confirmed before engaging them. The council sets its own requirements, so check what PMHC, Kempsey Shire or MidCoast will accept before booking.
Cost of a site assessment and percolation test
No publisher this site relies on gives a NSW or Mid North Coast price for a site and soil assessment. What drives a quote is the number of test pits and boreholes, laboratory testing, the system type and how constrained the site is. The council fees that follow are published: PMHC’s 2026-27 fee to install, construct and operate a new domestic facility is $645.00, including assessment, three inspections and the first approval to operate (PMHC Fees & Charges 2026-27, p.19). The new septic install cost guide covers the rest of the project.
Timing the assessment: seasonal considerations
No NSW rule on the season for testing was found. What the guidelines rely on instead is the soil record: mottling and nodules show seasonal saturation even when the pit is dug in dry weather (section 4.3.4). Book the assessment early, before house plans are fixed, because the guidelines stress that considering wastewater early “is likely to reduce constraints” later (section 4.1).
FAQ
Do I need a percolation test for an AWTS installation?
Not a falling-head perc test, which the OLG guidelines rule out for any system. A site and soil evaluation is still required, because the guidelines require it for all onsite system designs; the level of soil investigation varies with the type of effluent application system (section 4.3.3).
Can I use a percolation test result from a neighbouring property?
No. The guidelines call for test pits and boreholes within the proposed effluent area on the lot being designed, and say evaluation “should be completed for each individual lot” (section 4.3).
What happens if my soil won’t absorb effluent?
It does not rule out an on-site system. Depending on the limit, the guidelines’ options include importing soil, a raised bed or mound, or secondary treatment with irrigation at a lower rate. The assessor recommends the combination in the report.
Who organises the percolation test, the owner or the installer?
The owner. The OLG guidelines say the responsibility for engaging a suitably qualified assessor “lies with the landowner or developer”. An installer may suggest one, but the assessor works to the council’s requirements.
How long are percolation test results valid?
No NSW rule found sets an expiry date. The OLG guidelines say site and soil evaluation should be completed “as part of each individual OWMS design” (section 4.3), so a report written for a different design, or before fill, drainage or other site changes, may need updating. Ask the council whether it will accept an older report before relying on one.
Sources
- NSW Office of Local Government, Onsite Wastewater Management Guidelines (April 2025): sections 4.1 to 4.3.4 (site and soil evaluation, test pits, mottling, permeability, Table 4-7) and 6.3.1 (design loading rates). Checked 16/11/2026.
- Port Macquarie-Hastings Council, On-site sewage approvals: geotechnical waste water report for section 68 applications. Checked 16/11/2026.
- Port Macquarie-Hastings Council, Fees & Charges 2026-27: new domestic facility fee, p.19. Checked 16/11/2026.