A septic maintenance log is the owner’s own record of every pump-out, inspection, service visit and repair on the system. For an aerated wastewater treatment system (AWTS), NSW Health’s accreditation conditions also require a written service report after every service, with a copy going to the council. For a conventional tank, the owner’s own receipts and notes are the only history a buyer or the next contractor will see.
What NSW requires for an AWTS
NSW Health’s Secondary Treatment System Accreditation Guideline (2018) says the owner or occupier must hold a service contract of at least 12 months with a service agent employed or authorised by the manufacturer, and that the system is serviced at the interval set in its certificate. The same guideline names two forms:
- the manufacturer’s service report form, a copy of which is given to the owner or occupier
- the Local Council Service Report, which the agent submits to the council “immediately after each and every service”
The agent must also report to the council where the owner does not accept recommended remedial actions. MidCoast Council says its role is to review the service reports agents submit, and Kempsey Shire Council’s AWTS checklist asks for the report within seven days of each service. Port Macquarie-Hastings Council’s on-site sewage page does not set out its own servicing wording, so ask PMHC directly what it expects. The owner’s copy of each manufacturer’s report is the AWTS log. What a contract should cover is in the AWTS service contracts guide and on the AWTS servicing page.
What a conventional septic tank needs on record
No routine report to council was found for a conventional tank and trench. The NSW Department of Local Government’s Easy Septic Guide (2000, still linked by MidCoast and Kempsey councils) includes a blank “Septic maintenance record sheet” with space for a sketch of the system layout, council and contractor contact details, the operating approval’s issue and expiry dates, and a dated table for pump-outs, inspections, de-sludging and repairs. Its suggested frequencies are inspection every 1-2 years and de-sludging every 3-5 years; its “every week” pump-out column applies only to pump-out systems, which the guide’s main text says are pumped every 1 to 2 weeks in full-time use (p.15). MidCoast describes the 3 to 5 year de-sludging range as “dependent on usage”, so it is a guide, not a rule.
What to write down after each visit
The fields on NSW Health’s Local Council Service Report make a sensible template for any system:
| Entry | Why it is worth recording |
|---|---|
| Date of the visit, and the date the next one is due | Shows the interval being kept; the NSW Health form asks for both |
| Contractor’s business name and contact details | The next owner or contractor can follow up |
| What was done: pump-out, desludge, inspection or AWTS service | A pump-out and a full desludge are different jobs |
| Volume pumped and where the load was taken | Councils charge carriers for disposal by volume, so it should match the invoice |
| Condition noted: odours, alarm tested, sludge level, lid and baffles | Repeat findings show a fault that has not been fixed |
| Land application area: ponding, run-off, effluent leaving the property | The NSW Health form checks each of these |
| Action recommended, and whether it was done | The form asks whether the owner took recommended actions |
Keep invoices with the log. The septic pump-out cost guide sets out what a pump-out invoice or quote should itemise, including disposal.
Reading a log you have inherited
When buying, or just after settlement, look for:
- Gaps between AWTS service dates. Each report records the last service and the next one due, so a missing run is easy to see.
- The same recommendation more than once. A fault flagged at several services, with “no” against whether the owner acted, is likely still there.
- The last de-sludge date. Compare it with the 3 to 5 year guide range and the household’s size.
- The approval to operate. PMHC says new owners must apply for approval to operate “within 3 months of property transfer” (PMHC, On-site sewage approvals); MidCoast approvals are “automatically renewed every 3 years”. The change of ownership guide covers the transfer, and the pre-purchase inspection checklist covers what to check before exchange.
If the log is missing or incomplete
- Ask the council what it holds. PMHC charges $60.00 for written confirmation of a system’s registration and approval to operate (PMHC Fees and Charges 2026-27, p.20). MidCoast keeps a register of about 13,000 systems and says a copy of the approval to operate can be provided on request.
- Ask the AWTS service agent for copies of past service reports.
- Set a baseline. A pump-out or a septic inspection records the tank’s condition now.
- Start the log from today. This site has no reminder service, so note each date where it will be found.
Request a quote for a pump-out, inspection or AWTS service, with the suburb and what records exist.
Frequently asked questions
How long should septic records be kept?
No NSW rule found sets a retention period for a household’s own septic records. Keeping them for as long as the property is owned, then passing them to the buyer, is the practical choice; even a patchy inherited log is worth keeping.
Do I have to send my service records to council?
For an AWTS, the service agent sends NSW Health’s Local Council Service Report after every service, so the owner does not post it separately. For a conventional tank no routine report was found, but councils do inspect: MidCoast says it proactively inspects systems in high-risk areas.
Is a verbal update from the service agent enough?
Not for an AWTS. NSW Health’s guideline requires the manufacturer’s service report form, with a copy to the owner or occupier, so ask for it after every visit.
Sources
- NSW Health, Secondary Treatment System Accreditation Guideline 2018: service contract, service report forms and the Local Council Service Report fields, checked 15/11/2026
- NSW Department of Local Government, The Easy Septic Guide (2000), hosted by MidCoast Council: septic maintenance record sheet and suggested frequencies, pump-out systems every 1 to 2 weeks (p.15), checked 16/11/2026
- MidCoast Council, On-site wastewater management: review of service reports, register, approval to operate renewal and inspections, checked 15/11/2026
- Kempsey Shire Council, AWTS checklist: service report to council within seven days, checked 15/11/2026
- Port Macquarie-Hastings Council, On-site sewage approvals: new owner approval to operate, checked 15/11/2026
- Port Macquarie-Hastings Council, Fees and Charges 2026-27: written confirmation of registration and approval to operate, p.20, checked 15/11/2026