A pressure sewer replaces on-site treatment with a small tank and pump on each property that pushes household sewage through narrow pipes to the council’s sewerage system. It is not something an owner can choose on their own: it exists only where a council has built a scheme. Port Macquarie-Hastings Council (PMHC) provides it to “some homes” in Long Flat, Herons Creek, Beechwood, North Shore, Telegraph Point and Comboyne (PMHC ConnectEd, 8 June 2023). Everywhere else without sewer, PMHC says on-site systems “are required” (PMHC, On-site sewage approvals).
How a pressure sewer works
PMHC describes the unit as “a below-ground collection chamber and pump unit which stores, grinds and pumps sewage under pressure into council’s sewerage system” (PMHC, Pressure sewer systems). Under normal running the tank holds at most 112 litres before it pumps down to 80 litres. If something goes wrong it can store up to 720 litres, which PMHC puts at “approximately 2 days” of normal use (same page).
Three practical points from the same PMHC page:
- It runs on the house’s power. “When there is no electrical power, the pressure sewer system is unable to operate”, so water use should be cut back during an outage.
- It has an alarm. The control panel has audible and visible alarms. PMHC’s steps: silence the alarm with the button on the controller, stop non-essential water use, wait an hour, and contact council if the warning light stays on.
- The overflow relief gully must stay clear. It lets sewage surcharge outside the house during a blockage or “significant wet weather event”, so landscaping must not block it.
Where pressure sewer is used
PMHC says pressure sewer suits land that is very flat or very hilly, areas with high water tables or regular flooding, and homes far from the main treatment plants (PMHC ConnectEd). It asks anyone who has been contacted about connecting to check with council.
Kempsey Shire Council has also built one: the South Kempsey Pressure Sewer Scheme for its Employment Lands Hub, completed in September 2022. Landowners there are “eligible to opt in” and pay “a minimum fee of $5,000” to connect (Kempsey Shire Council, South Kempsey Pressure Sewer Scheme). That is a council connection fee for that scheme, not a guide to other schemes.
Pressure sewer or keep the septic?
Where a scheme is offered, the trade-off is roughly this. Connection fees, sewer charges and who owns and maintains the pump unit are set scheme by scheme; none of the PMHC pages read for this guide state them, so ask council in writing.
| On-site septic or AWTS | Pressure sewer | |
|---|---|---|
| Treatment | On the property: tank plus trench or irrigation area | At council’s plant |
| Routine owner tasks | Pump-outs; an AWTS also needs servicing at the interval in its NSW Health accreditation | Keep the pump powered, act on alarms, keep the overflow gully clear |
| Council paperwork | Approval to operate and an annual on-site sewage charge | Set by the scheme; ask council |
| Old system | Stays in use | Decommissioned to council’s requirements |
The NSW Easy Septic Guide (2000) suggests de-sludging a septic tank every 3 to 5 years as a guide, depending on use. PMHC’s 2026-27 annual on-site sewage charge for a residential system is $50.00 (low risk), $100.00 (medium risk) or $140.00 (high risk) (PMHC Fees & Charges 2026-27, p.20). Those are the costs a connection replaces; what replaces them depends on the scheme. The septic tank vs sewer connection guide covers connecting to conventional gravity sewer.
What happens to the old tank
Once a property is connected, the old septic tank or AWTS has to be taken out of service the way council requires. MidCoast Council, for example, requires all effluent and sludge to be removed first “by an approved liquid waste transporter” (MidCoast Council, On-site wastewater management). The decommissioning old septic tanks guide covers the steps. A final septic pump-out is the part this site can refer.
Frequently asked questions
Is pressure sewer available at my address?
Only council can confirm it. PMHC lists the localities where it provides pressure sewer to some homes, but not every property in those places is connected (PMHC ConnectEd).
What should I do if the pressure sewer alarm goes off?
PMHC says to silence the alarm, stop non-essential water use and wait an hour; if the warning light stays on, contact council (PMHC, Pressure sewer systems). PMHC’s steps point to council, not a septic contractor, as the contact.
Does a pressure sewer work in a blackout?
No. PMHC says the system cannot operate without power and asks residents to limit the sewage going into it until power returns, then reset the unit.
Request a quote for a pump-out or decommissioning pump-out of an old tank. If the enquiry is referred, an independent licensed contractor quotes in their own name.
Sources
- Port Macquarie-Hastings Council, Pressure sewer systems: how the unit works, storage, power, alarm and overflow gully, checked 15/11/2026
- PMHC ConnectEd, Benefits of pressure sewer over septic systems (8 June 2023): where PMHC provides pressure sewer and why, checked 15/11/2026
- Port Macquarie-Hastings Council, On-site sewage approvals: where on-site systems are required, checked 15/11/2026
- Port Macquarie-Hastings Council, Fees & Charges 2026-27: annual on-site sewage charges, p.20, checked 15/11/2026
- Kempsey Shire Council, South Kempsey Pressure Sewer Scheme: scheme completion and connection fee, checked 15/11/2026
- MidCoast Council, On-site wastewater management: decommissioning requirements, checked 15/11/2026
- NSW Health, Secondary Treatment System Accreditation Guideline: AWTS servicing interval set per certificate, checked 15/11/2026
- NSW Department of Local Government, The Easy Septic Guide (2000, hosted by MidCoast Council): de-sludging guide range, checked 15/11/2026