Converting a conventional septic system to an aerated wastewater treatment system (AWTS) means a new treatment unit, usually a new irrigation area, power to the tank, council approval and decommissioning of whatever is no longer used. The only published installed figure is national: Airtasker puts a wastewater treatment system, supplied and installed, at $15,000-$20,000, in a page last updated in January 2023 (Airtasker, Septic tank installation cost). No publisher gives a Port Macquarie, Kempsey or NSW figure, so a written quote for the site is the number to rely on.
Published figures and council fees
| Item (publisher’s label) | Published figure | Unit / GST | Source |
|---|---|---|---|
| Wastewater treatment system, supplied and installed, national | $15,000-$20,000 | Per system; GST not stated | Airtasker, Septic tank installation cost, last updated 17 January 2023 |
| Basic septic tank, family home, supplied and installed, national (for comparison) | $10,000-$12,000 (low / median / high $10,000 / $11,000 / $12,000) | Per system; GST not stated | Airtasker, Septic tank installation cost, 17 January 2023 |
| Council fee, PMHC: install, construct and operate a new facility, domestic / alter an existing facility, domestic | $645.00 / $315.00 | Each; new facility incl. 3 inspections and first approval to operate | PMHC Fees & Charges 2026-27 p.19 |
| Council fee, MidCoast: approval to install a new system / all other work incl. tank changeovers (aerated systems only) | $660.00 / $280.00 | Each | MidCoast Fees and Charges 2026-27 p.34 |
| Council fee, Kempsey: septic tank or other waste storage/treatment application, domestic / modify or alter an existing system | $607.00 / $262.00 | Each; “Does not include inspection fee.” | Kempsey 2026/2027 Schedule of Fees & Charges p.15 |
Which council fee applies depends on whether council treats the job as a new installation or an alteration; ask before lodging. The full set of council fees is in the septic pump-out cost guide, and the parts of a new installation are broken down in the new septic install cost guide.
What drives the quote
- The approval and design work. Installing or altering a system needs a section 68 approval under the Local Government Act 1993, lodged through the NSW Planning Portal; PMHC asks for a geotechnical wastewater report, a site plan and system details (PMHC, On-site sewage approvals). The report and design are paid to the consultant, on top of the council fee.
- The unit. A household AWTS is normally a design accredited by NSW Health, which keeps a register of accredited systems. An accredited unit must be installed to its accredited design and not modified, except that individual components such as pumps may be substituted if they meet the specification (NSW Health, Secondary Treatment System Accreditation Guideline, A3.1.3). Brand and capacity change the price.
- The irrigation area. AWTS effluent is disinfected and pumped to an irrigation area, with fixed drip lines preferred (NSW Department of Local Government, The Easy Septic Guide, 2000). Its size and layout come from the site assessment.
- Power. The blower and pumps need a permanent supply, and NSW Health’s guideline says councils should require electrical work to be done by a licensed electrician. Distance from the switchboard matters.
- Access and ground. Excavator access, rock, slope and wet ground all change the earthworks.
- The old tank. MidCoast Council says redundant tanks must be decommissioned in line with NSW Health’s Advisory Note 3, with effluent and sludge removed first by an approved liquid waste transporter (MidCoast Council, On-site wastewater management). NSW Health has since permanently removed its Advisory Notes (NSW Health, Advisory Note 3 page, checked 15/11/2026), so ask the council which decommissioning method it now accepts. The decommissioning guide covers the steps.
When an upgrade comes up
There is no single trigger. A failed trench with no room for a new one, a renovation or extension that adds bedrooms, or a council inspection can each lead to the question. PMHC says its pre-purchase inspection flags “any potential upgrades or repairs that may be required for continued approval to operate”, and it recommends one before buying (PMHC). An AWTS is not the only option either: a sand filter or a redesigned conventional system may suit some sites, which is a question for the site assessment. A septic inspection of the existing system is a sensible first step.
Ongoing costs after the upgrade
An AWTS swaps one pump-out every few years for regular servicing. NSW Health’s accreditation requires a service contract of at least 12 months with a manufacturer-authorised agent, and MidCoast Council words the interval as every 3 months. No publisher gives a Port Macquarie or NSW servicing price; the aerated system servicing page lists what to ask. Kempsey Shire’s AWTS checklist adds a desludge of the primary chamber every 3 to 5 years, and the council’s annual on-site sewage charge still applies. The long-run comparison is in the septic vs AWTS lifetime cost guide.
Request a quote with the suburb, the number of bedrooms and what the current system is.
FAQs
Can the existing septic tank be reused?
Only if the accredited design allows it. NSW Health’s guideline requires the system to be installed to its accredited design, so whether any part of the old system can stay is a question for the designer and council.
How long does an upgrade take?
It depends on the site assessment, council’s assessment of the section 68 application and the installer’s schedule. Ask the designer and installer for their timeframes in writing.
Are there grants for AWTS upgrades in NSW?
This site found no published NSW grant for domestic AWTS upgrades. Ask the council whether it runs any local program.
Does the council charge more each year for an AWTS?
PMHC’s annual residential charge is set by risk band, from $50.00 to $140.00 in 2026-27, not by system type (PMHC fees p.20). PMHC does not publish how a system is classed.
Sources
- Airtasker, Septic tank installation cost: national installation figures, last updated 17 January 2023, checked 15/11/2026
- Port Macquarie-Hastings Council, Fees & Charges 2026-27: pp.19-20, checked 15/11/2026
- Port Macquarie-Hastings Council, On-site sewage approvals: section 68 and pre-purchase inspections, checked 15/11/2026
- MidCoast Council, Fees and Charges 2026-27: p.34, checked 15/11/2026
- MidCoast Council, On-site wastewater management: servicing and decommissioning, checked 15/11/2026
- Kempsey Shire Council, 2026/2027 Schedule of Fees & Charges: p.15, checked 15/11/2026
- Kempsey Shire Council, AWTS checklist: desludging every 3 to 5 years, checked 15/11/2026
- NSW Health, Secondary Treatment System Accreditation Guideline and register of accredited AWTS: accreditation, servicing and installation conditions, checked 15/11/2026
- NSW Department of Local Government, The Easy Septic Guide (2000, hosted by MidCoast Council): how an AWTS disperses effluent, checked 15/11/2026