A rural property’s septic system comes with its history: its council approval, its maintenance record and the condition of a tank and trenches that are mostly underground. Port Macquarie-Hastings Council (PMHC) points out that septic systems “are not covered in building inspections” and recommends a pre-purchase inspection before buying (PMHC, On-site sewage approvals). The checks below are the ones to make before exchange.
1. Which council, and what do its records say?
Start with the council, because the rules and the pre-purchase options differ. The rates notice shows which one applies; around the Hastings it is PMHC, Kempsey Shire or, for places such as Coopernook, Oxley Island and Hannam Vale, MidCoast.
- PMHC offers a pre-purchase inspection that gives “a summary of Council records about the system” and flags upgrades or repairs that may be needed for continued approval to operate (PMHC). In 2026-27 it costs $340.00 standard (under 21 business days) or $465.00 urgent (under 2 days), and includes the approval to operate if the sale proceeds (PMHC Fees & Charges 2026-27 p.20).
- MidCoast says a buyer “can request a pre-purchase inspection at no charge” (MidCoast Council, On-site wastewater management).
- Kempsey Shire: ask council what it offers before exchange.
Ask the conveyancer to obtain the approval to operate, its conditions and any outstanding notices. What a section 10.7 planning certificate does and does not show is covered in the conveyancing red flags guide.
2. Questions to ask the seller
NSW’s Easy Septic Guide (NSW Department of Local Government, 2000, hosted by MidCoast Council) suggests asking:
- How old is the septic system?
- When was the tank last pumped out and de-sludged, and how often?
- Have there been any signs of failure?
- Have there been additions to the house that might mean the system needs to be bigger?
Add the system type (conventional tank and trenches, aerated system, sand filter or pump-out system) and where the tank lid and trench or irrigation lines are. Ask for paperwork rather than recollection: pump-out receipts with dates and the operator’s name, and any council letters. The guide itself says “It’s always a good idea to get a specialist to survey the septic system before you buy”.
3. Pump-out and service history
For a conventional tank, the Easy Septic Guide says “You should have your tank pumped every 3 to 5 years”; Kempsey Shire’s septic checklist says frequency “will vary depending on the number of occupants” (Kempsey Shire Council, septic checklist). If the seller cannot show a pump-out in that range, a pre-settlement pump-out is a reasonable thing to negotiate.
For an aerated wastewater treatment system (AWTS), ask for the recent service reports. NSW Health’s accreditation conditions require a service contract of at least 12 months with a manufacturer-authorised agent, who sends a report to council after every service (NSW Health, Secondary Treatment System Accreditation Guideline). Missing reports are worth querying with council before exchange.
4. What to look for on a walk-around
The Easy Septic Guide’s own checklist says a system may need attention if:
- the air around it smells, usually like rotten egg gas
- the ground is damp or soggy, or pools form downhill
- there is lots of dark green grass on or around the absorption area
- toilets or drains are slow to clear or keep backing up
- the tank has not been checked for over 12 months, or pumped in the past 3 to 5 years
Also note anything built over the trench area. The guide says not to drive or graze animals on it, not to cover it with concrete or pavers, and that small trees should be at least 5 m away and large trees over 20 m. Livestock, a second dwelling or a granny flat added since the system was approved are all worth raising with council and the inspector.
A walk-around cannot see the tank’s baffles or the inside of the pipes. That is what a septic inspection is for; the pre-purchase inspection checklist sets out what a good report covers.
5. After settlement
The approval does not simply pass to the buyer. The Easy Septic Guide says “The approval relates to the owner, not the land”, and PMHC says new owners must apply for an approval to operate “within 3 months of property transfer” (PMHC). The steps are in the change of ownership guide, and the council fees are in the septic pump-out cost guide.
Checklist summary
| Check | Who obtains it | What to look for |
|---|---|---|
| Council approval to operate and conditions | Conveyancer or council | Current, no outstanding notices |
| Council pre-purchase inspection | Buyer, via council | Condition and any required repairs or upgrades |
| Pump-out receipts | Seller | Dates and operator |
| AWTS service reports | Seller or council | Regular services, reports lodged |
| Walk-around | Buyer | Smells, soggy ground, lush strips, slow drains, structures over trenches |
| Independent inspection | Buyer | Tank, baffles, inlet, trench or irrigation area |
Request a quote for a pre-purchase inspection or pump-out, with the suburb and settlement date.
Rural septic buying checklist FAQs
Can the seller be asked to fix the system before settlement?
That is a matter for negotiation and the contract. The conveyancer or solicitor should word any condition or price adjustment.
There is no septic paperwork at all. Is that a deal-breaker?
Not necessarily, but it is a gap. Ask council what it holds; PMHC’s pre-purchase inspection includes a summary of its records (PMHC). Then commission an inspection and weigh the findings in the offer.
Does the approval to operate transfer automatically?
No. The Easy Septic Guide says the approval relates to the owner, not the land, and in PMHC new owners apply within 3 months of transfer.
Sources
- Port Macquarie-Hastings Council, On-site sewage approvals: pre-purchase inspections, new-owner approval, checked 15/11/2026
- Port Macquarie-Hastings Council, Fees & Charges 2026-27: p.20 pre-purchase inspection fees, checked 15/11/2026
- MidCoast Council, On-site wastewater management: pre-purchase inspection at no charge, checked 15/11/2026
- NSW Department of Local Government, The Easy Septic Guide (2000, hosted by MidCoast Council): buyer questions, warning signs, trench care, approval relates to the owner, checked 15/11/2026
- Kempsey Shire Council, septic system checklist: pump-out frequency varies with occupants, checked 15/11/2026
- NSW Health, Secondary Treatment System Accreditation Guideline: AWTS service contracts and council reports, checked 15/11/2026