The only published installed cost for a new septic system is national: Airtasker puts a basic septic tank for a family home, supplied and installed, at $10,000-$12,000 and a wastewater treatment system at $15,000-$20,000, on a page last updated in January 2023 (Airtasker, Septic tank installation cost). In NSW the council approval fee is extra: in 2026-27 it is $645.00 at Port Macquarie-Hastings, $660.00 at MidCoast and $607.00 plus inspection fees at Kempsey Shire (table below). The total is the sum of several separate jobs: a site and soil assessment, council approval, the tank, the effluent area, the earthworks and licensed plumbing. No publisher gives a NSW or Port Macquarie installed price, so a written, itemised quote for the site is the figure to rely on.
This site is a referral service and sets no prices. Every figure below is another organisation’s published figure or a council’s fee, named and dated.
The line items in a new septic install
A quote for a new system should account for each of these:
- Site and soil assessment and design. Port Macquarie-Hastings Council (PMHC) asks for a geotechnical wastewater report with the application (PMHC, On-site sewage approvals).
- Council approval fee under section 68 of the Local Government Act 1993 (fees below).
- The tank or treatment unit, which must be a NSW Health accredited design (see below).
- The effluent application area: absorption trenches or beds, a mound, or an irrigation area.
- Excavation and earthworks for the tank and the effluent area.
- Licensed plumbing and drainage, including the house drain to the tank.
- Power for any pump or AWTS blower.
- Decommissioning any old tank that is being replaced.
Ask for each line to be priced separately so two quotes can be compared.
Wastewater management report and Section 68 approval fees
The report is paid to the consultant, not the council. The NSW Office of Local Government’s Onsite Wastewater Management Guidelines (April 2025) expect the site and soil evaluation to be done by suitably qualified and experienced professionals, engaged by the landowner or developer (p.45), and no publisher gives a price for it, so ask the consultant for a fixed fee in writing.
The council fee depends on which council the property is in. The 2026-27 fees for the three councils this site covers:
| Council | Fee (council’s label) | Amount | Unit / GST | Source |
|---|---|---|---|---|
| Port Macquarie-Hastings | Install, construct and operate a new sewage management facility (domestic) | $645.00 | Each; GST $0.00; “Includes assessment, 3 x inspections, 1st approval to operate” | PMHC Fees & Charges 2026-27 p.19 |
| MidCoast | Approval to install a new system | $660.00 | Each; same in GST-exclusive and inclusive columns | MidCoast Fees and Charges 2026-27 p.34 |
| Kempsey Shire | Septic tank or other waste storage/treatment application (domestic) | $607.00 | Each; GST N; “Does not include inspection fee.” | Kempsey 2026/2027 Schedule of Fees & Charges p.15 |
| Kempsey Shire | Development and compliance inspection fee: 48 hours notice / urgent | $200.00 / $350.00 | Per inspection; GST Y | Kempsey 2026/2027 Schedule of Fees & Charges p.16 |
The steps of the PMHC application are in the council septic approval guide.
Tank and trench materials
The tank. The OLG guidelines say all domestic septic tanks and collection wells must be accredited under NSW Health’s vessel accreditation guideline where daily flow is up to 2 kL and up to 10 people (p.102). They size a tank from the design occupancy: a three-bedroom house counts as 5 people (Table 6-1, p.128), and the minimum tank for 5 people is 2,750 litres (Table 6-3, p.132).
An AWTS. A household aerated system is normally a NSW Health accredited design, listed on its register of accredited systems, and must be installed to that design (NSW Health, Secondary Treatment System Accreditation Guideline, A3.1.3). Brand and capacity change the price.
The effluent area. The OLG guidelines describe absorption trenches and beds as gravel or arch systems with a distribution pipe along the full length; pressure dosing gives more even distribution and is preferred over gravity feed, and the base should be laser levelled (p.118). Its size comes from the soil assessment, so material cost is unknown until the report is done.
Excavation, plumbing and commissioning
Excavation cost moves with ground conditions, machine access and the distance from the house to the tank and effluent area. Drainage work is licensed work in NSW: the NSW Government says draining “includes work on a house drain connected to an onsite wastewater management system” (NSW Government, Plumbing, draining and gasfitting). For an AWTS, NSW Health’s guideline says councils should require the electrical work to be done by a licensed electrician. Whether reinstating lawns and gardens is included varies; ask.
Typical all-in ranges: conventional septic vs AWTS
| Item (publisher’s label) | Published range | Unit / GST | Source |
|---|---|---|---|
| Basic septic tank, family home, supplied and installed, national | $10,000-$12,000 (low / median / high $10,000 / $11,000 / $12,000) | Per system; GST not stated | Airtasker, Septic tank installation cost, last updated 17 January 2023 |
| Wastewater treatment system, supplied and installed, national | $15,000-$20,000 | Per system; GST not stated | Airtasker, Septic tank installation cost, 17 January 2023 |
Both rows are national and nearly four years old, and council fees are extra. Converting an existing septic to an AWTS is covered in the AWTS upgrade cost guide.
How site conditions change the price
The OLG guidelines’ comparison of system components (Table 7-2, pp.172-173) points to the site factors that move a design, and so a price:
- Shallow rock or a high water table. Where the 0.6 metre separation between the base of the effluent area and rock or groundwater required by AS/NZS 1547:2012 cannot be achieved, the area may need to be raised above ground level with imported topsoil (pp.156-157).
- Heavy clay. Absorption systems need a large area in low permeability soils such as medium to heavy clays (p.172).
- Slope. Absorption systems need specific design on slopes over 15%, and subsurface irrigation over 30% (pp.172-173).
- Access. A tight driveway or soft ground can mean smaller machines and more labour.
- The old tank. MidCoast Council says a redundant tank must be decommissioned in line with NSW Health’s Advisory Note 3, with effluent and sludge removed first by an approved liquid waste transporter (MidCoast Council, On-site wastewater management). NSW Health has since permanently removed its Advisory Notes (NSW Health, Advisory Note 3 page), so ask the council which method it now accepts.
Regional cost factors on the Mid North Coast
The main local difference is which council approves and charges for the system, and the annual charge that follows installation. In 2026-27 the annual on-site sewage charge is $50.00 (low risk), $100.00 (medium risk) or $140.00 (high risk) for a residential system at PMHC (PMHC Fees & Charges 2026-27, p.20), $92.00 at MidCoast (MidCoast Fees and Charges 2026-27, p.34) and $105.00 for a single dwelling at Kempsey (Kempsey 2026/2027 Schedule, p.46). Travel to a hinterland block may appear as its own line; ask for it to be shown. The full set of council fees is in the septic pump-out cost guide.
How to keep install costs down
- Get the site assessment done first. Quotes before the report are guesses.
- Get itemised written quotes that price the same design, so they can be compared line by line.
- Ask whether the council fee is included, and who lodges the application.
- Ask about a larger tank. The OLG guidelines say a tank above the minimum gives a longer retention period and better effluent, and “may also be more economical to purchase” (p.132).
- Coordinate with other earthworks if a house or extension is being built at the same time.
New septic install cost FAQs
Do I need a wastewater management report for every new install?
At PMHC, yes: the section 68 application needs a geotechnical wastewater report, a site plan and details of the system (PMHC). Other councils set their own requirements, so ask before engaging a consultant.
Can I save money by supplying the tank myself?
Only if the tank is a NSW Health accredited design and matches the approved design. Whether an installer will fit a client-supplied tank, and on what warranty terms, is the installer’s decision; ask for both in writing.
How long does the whole process take from decision to commissioning?
No council in this area publishes a set assessment time. It depends on the consultant, council assessment of the application and the installer’s schedule, so ask each for a timeframe in writing.
Is an AWTS always more expensive to own over time than a conventional septic?
An AWTS adds regular servicing: NSW Health’s accreditation sets the interval per certificate and requires a service contract of at least 12 months, and MidCoast Council words it as every 3 months (MidCoast Council). No publisher gives a NSW servicing price; the septic vs AWTS lifetime cost guide sets out the comparison.
Can I connect to sewer instead of installing a new system?
Only where a sewer service is available. PMHC says on-site systems are “required in all areas where connection to a sewer service is not available” (PMHC). Ask the council whether a sewer service is available to the lot.
Request a quote with the suburb, the number of bedrooms and whether a soil report has been done. A septic inspection of any existing system is a sensible first step where one is being replaced.
Sources
- Airtasker, Septic tank installation cost: national installed figures, last updated 17 January 2023. Checked 16/11/2026.
- NSW Office of Local Government, Onsite Wastewater Management Guidelines (April 2025): tank accreditation and sizing, absorption systems, raised beds, Table 7-2. Checked 16/11/2026.
- Port Macquarie-Hastings Council, Fees & Charges 2026-27: pp.19-20. Checked 16/11/2026.
- Port Macquarie-Hastings Council, On-site sewage approvals: section 68 documents, where on-site systems are required. Checked 16/11/2026.
- MidCoast Council, Fees and Charges 2026-27: p.34. Checked 16/11/2026.
- MidCoast Council, On-site wastewater management: AWTS servicing and decommissioning. Checked 16/11/2026.
- Kempsey Shire Council, 2026/2027 Schedule of Fees & Charges: pp.15, 16 and 46. Checked 16/11/2026.
- NSW Health, Secondary Treatment System Accreditation Guideline and register of accredited AWTS: accreditation, installation and servicing. Checked 16/11/2026.
- NSW Health, Advisory Note 3 page: Advisory Notes permanently removed. Checked 16/11/2026.
- NSW Government, Plumbing, draining and gasfitting: draining licence scope. Checked 16/11/2026.